summaryrefslogtreecommitdiff
path: root/doc/en_US/analytics.markdown
diff options
context:
space:
mode:
authorFrédéric Guillot <fred@kanboard.net>2018-04-06 10:54:58 -0700
committerFrédéric Guillot <fred@kanboard.net>2018-04-06 10:54:58 -0700
commit0b306fa60ad84ea077111e0ff7b59208ba7bc8a3 (patch)
tree5d8941b5950ede2db8ca3fba0213792db0f07a50 /doc/en_US/analytics.markdown
parentac11220a1aa7ae30b8827d9bbf221888d3edd0a7 (diff)
Move documentation to https://docs.kanboard.org/
Diffstat (limited to 'doc/en_US/analytics.markdown')
-rw-r--r--doc/en_US/analytics.markdown67
1 files changed, 0 insertions, 67 deletions
diff --git a/doc/en_US/analytics.markdown b/doc/en_US/analytics.markdown
deleted file mode 100644
index 72987530..00000000
--- a/doc/en_US/analytics.markdown
+++ /dev/null
@@ -1,67 +0,0 @@
-Project Analytics
-=================
-
-Each project have an analytics section. Depending on how you are using Kanboard, you can see those reports:
-
-User repartition
-----------------
-
-![User repartition](../screenshots/user-repartition.png)
-
-This pie chart show the number of open tasks assigned per user.
-
-Task distribution
------------------
-
-![Task distribution](../screenshots/task-distribution.png)
-
-This pie chart gives an overview of the number of open tasks per column.
-
-Cumulative flow diagram
------------------------
-
-![Cumulative flow diagram](../screenshots/cfd.png)
-
-- This chart shows the number of tasks cumulatively for each column over the time.
-- The legend order is the same as the stack in the chart.
-- The color of each column is determined automatically.
-- Every day, the number of tasks is recorded for each column.
-- If you would like to exclude closed tasks, change the [global project settings](project-configuration.markdown).
-
-Note: You need to have at least two days of data to see the graph.
-
-Burn down chart
----------------
-
-![Burndown chart](../screenshots/burndown-chart.png)
-
-The [burn down chart](http://en.wikipedia.org/wiki/Burn_down_chart) is available for each project.
-
-- This chart is a graphical representation of work left to do versus time.
-- Kanboard use the complexity or story point to generate this diagram.
-- Everyday, the sum of the story points for each column is calculated.
-
-Average time spent into each column
------------------------------------
-
-![Average time spent into each column](../screenshots/average-time-spent-into-each-column.png)
-
-This chart shows the average time spent into each column for the last 1000 tasks.
-
-- Kanboard uses the task transitions to calculate the data.
-- The time spent is calculated until the task is closed.
-
-Average Lead and Cycle time
----------------------------
-
-![Average time spent into each column](../screenshots/average-lead-cycle-time.png)
-
-This chart show the average lead and cycle time for the last 1000 tasks over time.
-
-- The lead time is the time between the task creation and the date of completion.
-- The cycle time is time between the specified start date of the task to the completion date.
-- If the task is not closed, the current time is used instead of the date of completion.
-
-Those metrics are calculated and recorded every day for the whole project.
-
-Note: Don't forget to run the [daily cronjob](cronjob.markdown) to have accurate statistics.