diff options
author | Sencar TOSUN <siberaktif@gmail.com> | 2016-12-19 19:29:31 +0300 |
---|---|---|
committer | GitHub <noreply@github.com> | 2016-12-19 19:29:31 +0300 |
commit | 448b72d3b19ba0258ea15cd512685f986c47d16d (patch) | |
tree | 844805f0bdc9404e3451875e6614a349c4903760 /doc/tr_TR | |
parent | 11861044695e5a6553e5ca2b4db8f2fd57702f7f (diff) |
Create kanban-vs-todo-and-scrum.markdown
Diffstat (limited to 'doc/tr_TR')
-rw-r--r-- | doc/tr_TR/kanban-vs-todo-and-scrum.markdown | 37 |
1 files changed, 37 insertions, 0 deletions
diff --git a/doc/tr_TR/kanban-vs-todo-and-scrum.markdown b/doc/tr_TR/kanban-vs-todo-and-scrum.markdown new file mode 100644 index 00000000..a751b8c3 --- /dev/null +++ b/doc/tr_TR/kanban-vs-todo-and-scrum.markdown @@ -0,0 +1,37 @@ +Kanban - Todo Listeleri ve Scrum +============================== + +Kanban - Todo listeleri karşılaştırma +--------------------------------- + +### Todo listeleri: + +- Tek aşamalı (yalnızca bir öğe listesi) +- Çoklu görev mümkün (verimli değil) + +### Kanban: + +- Çok fazlı, her sütun bir adım temsil eder +- Sütun başına bir işi ilerleme sınırı belirleyebildiğiniz için Odaklanıp ve Çok görevden kaçınırsınız + +Kanban - Scrum karşılaştırma +------------------- + +### Scrum: + +- Sprint ler time-boxed zaman-kutuları, genellikle 2 veya 4 hafta +- Yineleme sırasında değişikliklere izin verilmez +- Tahmin gerekli +- Hız varsayılan metrik olarak kullanılır +- Scrum panosu her sprint arasında silinir +- Scrum, scrum master, ürün sahipleri ve takım gibi önceden tanımlanmış rollere sahiptir +- Bir çok toplantı: planlama, backlogs geri-bilgi düzenleme, günlük ayak üstü, retrospektif + +### Kanban: + +- Sürekli akış +- Değişiklikler her an yapılabilir +- Tahmin isteğe bağlıdır +- Performansı ölçmek için teslim ve döngü süresi kullanılır +- Kanban tahtası kalıcıdır +- Kanban sıkı kısıtlamalar veya toplantılar öngörmemektedir, süreç daha esnektir |