summaryrefslogtreecommitdiff
path: root/docs/board-configuration.markdown
diff options
context:
space:
mode:
Diffstat (limited to 'docs/board-configuration.markdown')
-rw-r--r--docs/board-configuration.markdown44
1 files changed, 1 insertions, 43 deletions
diff --git a/docs/board-configuration.markdown b/docs/board-configuration.markdown
index dda9787f..1c5ff51a 100644
--- a/docs/board-configuration.markdown
+++ b/docs/board-configuration.markdown
@@ -1,8 +1,5 @@
Board settings
-===============
-
-Some parameters for boards can be changed on the settings page.
-Only administrators can change those settings.
+==============
Go to the menu **Settings**, then choose **Board settings** on the left.
@@ -25,42 +22,3 @@ When you share a board, the page will refresh automatically every 60 seconds by
When your web browser is open on a board, Kanboard check every 10 seconds if something have been changed by someone else.
Technically this process is done by Ajax polling.
-
-### Default columns for new projects
-
-You can change the default column names here.
-It's useful if you always create projects with the same columns.
-
-Each column name must be separated by a comma.
-
-By default, Kanboard use those column names: Backlog, Ready, Work in progress and Done.
-
-### Default categories for new projects
-
-Categories are not global to the application but attached to a project.
-Each project can have different categories.
-
-However, if you always create the same categories for all your projects, you can define here the list of categories to create automatically.
-
-### Allow only one subtask in progress at the same time for a user
-
-When this option is enabled, a user can work with only one subtask at the time.
-
-If another subtask have the status "in progress", the user will see this dialog box:
-
-![Subtask user restriction](http://kanboard.net/screenshots/documentation/subtask-user-restriction.png)
-
-### Enable time tracking for subtasks
-
-When this option is enabled, each time the status of a subtask is changed, the start time and the end time are recorded in the database for the assignee.
-
-- When the status changes to "in progress" then the start time is saved
-- When the status changes to "done" then the end time is saved
-
-The time spent for the subtask and the task is also updated.
-
-### Show subtask estimates in the user calendar
-
-When enabled, assigned subtasks with the status "todo" and with a defined estimate value will be displayed on the user calendar.
-
-The user calender is available on the dashboard or from the user profile. \ No newline at end of file