summaryrefslogtreecommitdiff
path: root/docs/calendar.markdown
diff options
context:
space:
mode:
Diffstat (limited to 'docs/calendar.markdown')
-rw-r--r--docs/calendar.markdown6
1 files changed, 4 insertions, 2 deletions
diff --git a/docs/calendar.markdown b/docs/calendar.markdown
index 1dd4a08a..7b95baa2 100644
--- a/docs/calendar.markdown
+++ b/docs/calendar.markdown
@@ -8,11 +8,13 @@ There are two different views for the calendar:
At this time the calendar is able to display these information:
-- Tasks with a due date, displayed at the top. The date can be changed by moving the task to another day.
-- Tasks based on the creation date or the start date. These events cannot be modified with the calendar.
+- Tasks with a due date, displayed at the top. **The due date can be changed by moving the task to another day**.
+- Tasks based on the creation date or the start date. **These events cannot be modified with the calendar**.
- Subtask time tracking, all recorded time slot will be shown in the calendar.
- Subtask estimates, forecast of work left
![Calendar](http://kanboard.net/screenshots/documentation/calendar.png)
The calendar configuration can be changed in the settings page.
+
+Note: The due date doesn't contains time information.